(Amarante, GPS 41.306437, -8.026244)
Concrete channel that extends from the Fridão mini-hydro plant, to the Hydroelectric Power Station, used to conduct water from the reservoir to the power plant to produce electricity.
(Amarante, GPS 41.306437, -8.026244)
Concrete channel that extends from the Fridão mini-hydro plant, to the Hydroelectric Power Station, used to conduct water from the reservoir to the power plant to produce electricity.